After routing the p'up cavities and drilling the control holes it's had a good sanding and received its first coat of oil
Sunday, 29 January 2017
Pick up the walnut
Bobbins made. I've wrapped some paper around the steel pole pieces to provide a tiny bit of separation from the windings
3 hours later the p'ups are wound and tested. The neck comes out at 6.45k and the bridge a little hotter, with an extra thousand winds, comes out 7.6k.
The neck has alnico 2 and the bridge alnico 5 magnets.
Should look nice!
Next job to get the p'up routes done...
Next job first the p'ups is wax potting!
3 hours later the p'ups are wound and tested. The neck comes out at 6.45k and the bridge a little hotter, with an extra thousand winds, comes out 7.6k.
The neck has alnico 2 and the bridge alnico 5 magnets.
Should look nice!
Next job to get the p'up routes done...
Next job first the p'ups is wax potting!
Subscribe to:
Posts (Atom)